How do I create an Area?
An area is a designated physical location within the factory that may contain one or multiple work centers within the system.
1. Open system settings (Manager)
2. Go to Plant Config
3. Click on Area
4. Click on add new
5. Give the Area a name
6. Choose a Facility
7. Enter the start time of the day.
The Day Start Time is utilized by the system to define when a Shift Date begins, typically aligning with the Production Day Start Time. The Shift Date serves as the reference for reporting purposes.
8. Active:
Choose whether the area should be active or inactive.
9. Display Sequence
Defines the order in which Work Centres appear in the Plant Watch.
10. Import Delay
Leave this set to the default value "0".
11. Short Stops Limit
Measured in milliseconds. For example, if you set it to 60,000 milliseconds (1 minute), any stop shorter than that will be considered a short stop and will not prompt the operator to reassign it.
12 Startup Rejects Limit
Leave this set to the default value "0".